You don't have javascript enabled. Good luck with that.
Pencarian
Tanggul Sisi Timur Pulau Untung Jawa Diperbaiki

Levee on East Side of Untung Jawa Island Repaired

We repair the leeve to avoid abrasion that has been occurred lately

Due to abrasion, a levee located on the east side of Untung Jawa Island began to be repaired. It will be executed by adding the levee's bronjong (rocks wrapped in plaited wires).

"We repair the levee to avoid abrasion that has been occurred lately," expressed Mustajab, Head of Seribu Islands Natural Resources Sub-dept., Thursday (2/6).

Levees on Four Islands Repaired

Mustajab stated bronjong would be straightened up to 30 meters long, but still giving space for boat access.

"We use rock material which is still under auction stage worth Rp 1 billion. Hopefully, we can sign a contract by the end of this month," he hoped.

In addition, his party also plans to use the faulty bronjong at three points and add more breakwaters on the east side. "If the contract is still in one package with Tidung Island and Sebira Island this year," he finished. 

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye769 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye507 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye378 personAldi Geri Lumban Tobing
  4. 5M Movement Promoted to Create an Organized Utility Network

    access_time18-09-2026 remove_red_eye362 personFakhrizal Fakhri
  5. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye357 personDessy Suciati