You don't have javascript enabled. Good luck with that.
Pencarian
Tanggul Sisi Timur Pulau Untung Jawa Diperbaiki

Levee on East Side of Untung Jawa Island Repaired

We repair the leeve to avoid abrasion that has been occurred lately

Due to abrasion, a levee located on the east side of Untung Jawa Island began to be repaired. It will be executed by adding the levee's bronjong (rocks wrapped in plaited wires).

"We repair the levee to avoid abrasion that has been occurred lately," expressed Mustajab, Head of Seribu Islands Natural Resources Sub-dept., Thursday (2/6).

Levees on Four Islands Repaired

Mustajab stated bronjong would be straightened up to 30 meters long, but still giving space for boat access.

"We use rock material which is still under auction stage worth Rp 1 billion. Hopefully, we can sign a contract by the end of this month," he hoped.

In addition, his party also plans to use the faulty bronjong at three points and add more breakwaters on the east side. "If the contract is still in one package with Tidung Island and Sebira Island this year," he finished. 

Linked News
Popular News indeks
  1. City Council Strengthens Synergy with Central Legislators to Support Jakarta`s Development

    access_time30-07-2026 remove_red_eye1039 personFakhrizal Fakhri
  2. Jakarta Government Prepares Rp 249 B to Renovate Four Schools

    access_time25-07-2026 remove_red_eye877 personDessy Suciati
  3. Rano Urges Jakarta Scouts to Be Active in Waste Sorting Movement

    access_time25-07-2026 remove_red_eye691 personAldi Geri Lumban Tobing
  4. Pramono Encourages Residents to Stay Active at Rasuna Said CFD

    access_time26-07-2026 remove_red_eye622 personFolmer
  5. Jakarta Steps Up Food Waste Prevention

    access_time25-07-2026 remove_red_eye572 personAldi Geri Lumban Tobing